|
|
|
4
|
Sector
|
Health Services/Equipments Tenders
|
Tender Value
|
559.45 Million approx. / 55.94 Crore approx.
|
Location
|
Chhattisgarh Tenders
|
Ref.No
|
64930317
|
Closing Date
|
12 - Oct - 2023
|
12 Days to go
|
View Tender Details
|
|
Design, Drawing, Construction, Testing, Commissioning of Meatallic pantoon 6x4mtr., 3 Nos. 60 HP Raw water pumps Centrifugal Pumpsets, Raw Water Electric Sub station 160 KVA/11/0.415KV with all required Work, 6.5 MLD Conventional Water Treatment Plant, Clear Water Electric Sub station 250 KVA/11/0.415 KV with all required Work, 3 No. 60 BHP Raw water Centrifugal pumps 3 No. 61 BHP & 3nos. 35 BHP Clear water Centrifugal pumps and motors, 330 KL capacity 26mtr., staging MBR-1, 240 KL capacity 28mtr., staging MBR-2., 220 KL capacity 26mtr., staging MBR-3., RCC Clear Water Sump Capacity 50 KL cum pump house having 5.0m internal dia & 3m deep., 5HP Three phase open wall submersible pump 2no., Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 350 mm Dia Length- 4307 m and Clear water pumping main DI K-9 100mm dia – 3477m, 200mm dia -13761m, 250mm dia – 105m, 350mm dia – 100m., & Clear Water Gravity Mains line O-PVC PN-16 110 mm dia – 11271m., 160mm dia – 47350m., 250mm dia -24755 m., and DI pipe class K-7 300mm dia – 11676m., 350mm dia – 1677m., 400mm dia – 8464m., with all required valves & specials, Providing and fixing Bulk flow meters, for Entire Scheme upto Village OHTs, Allied All civil works. RCC approach road from main road to MBR 1, 2&3, Boundary wall around WTP campus & MBR’s campus, I-Type 6 no. & H-Type 2 no. Staff Quarters, all component 3 month testing and 9 month trial run under Darima-Karji Group Water Supply Scheme of Block Ambikapur & Lakhanpur, District (C.G.)
|
|
|
5
|
Sector
|
Health Services/Equipments Tenders
|
Tender Value
|
805.08 Million approx. / 80.50 Crore approx.
|
Location
|
Chhattisgarh Tenders
|
Ref.No
|
64933190
|
Closing Date
|
12 - Oct - 2023
|
12 Days to go
|
View Tender Details
|
|
Design, Drawing, Construcation, Testing, Commissioning of Intake well 6.0 m dai Height – 25.18 m, 3 Nos. 47 BHP Vartical Turbine Pump Raw water Pump and Motors, Raw water & Clear Water Electric Sub Station 33/0.415 KV with 1000 KVA Transformers i/c all required work , 12.00 MLD conventional type water Treatment Plant, 3 Nos. 118 BHP for Pondi khurd & 3 Nos. 196 BHP for Salka, Clear water Centrifugal Pump and Motors, , 250 KL capacity 20 m staging MBR - 1, 320 KL capacity 30 m staging MBR-2, 200 KL capacity 30 m staging MBR-3, 400 KL capacity 20 m staging MBR -4, 270 KL capacity 30 m staging MBR-5, Provinding Laying, Jointing, Testing, & Commissioning of Raw water pumping Main DI K-9 350 mm dai Total Length – 90 m and Clear water Pumping Main 100 mm dai DI K-9 Length – 7550 mts, 150 mm dai DI k-9 Length – 1713 mts, 200 mm dai DI K-9 Length – 7316 mts, 250 mm dai DI K-9 Length – 6545 mts, 300 mm dia. DI K-9 Length -6428 mts, Total Lngth – 29552 mts, & Clear water Gravity Main Pipe DI k-7 350 mm dai Length – 2023 mts, 300 mm dai Length – 11666 mts, O-PVC PN16 250 mm dia. Length –27266 M 160 mm dia Length – 51238 mts, 110 mm dai Length – 101307 mts, Total Length – 193500 mts, with all required Valves & Specials, Providing and Fixing Bulk Flow meter, for Entire Scheme upto Village OHT’s with all allied civil works including boundary wall around WTP and MBRs Campus, I- type 6 Nos. & H- type 4 Nos. Staff Quarters, including 3 month Testing and 9 months Trial Run under Pondi khurd - Salka Group Water Supply Scheme of Block – Ambikapur & Lakhanpur, District – Surguja (C.G.).
|
|
|
6
|
Sector
|
Health Services/Equipments Tenders
|
Tender Value
|
460.41 Million approx. / 46.04 Crore approx.
|
Location
|
Chhattisgarh Tenders
|
Ref.No
|
64933191
|
Closing Date
|
12 - Oct - 2023
|
12 Days to go
|
View Tender Details
|
|
Design, Drawing, Construcation, Testing, Commissioning of Metallic Floating Pontoon of size 6x4 mts. with anchoring, mooring and floating walkway – size 1M x 1.25M etc all complete works, 3 Nos. 63 BHP Raw water Centrifugal Pumpsets, Electric Sub Station 11/0.415KV- 160 KVA with all required work, 7.00 MLD conventional type water Treatment Plant, 11/0.415KV-250KVA Clear Water Electric Sub Station, 3 Nos. 92 BHP for Clear water Pump and Motors, with all required work, 140 KL capacity 30 m staging MBR - 1, 250 KL capacity 30 m staging MBR-2, 400 KL capacity 30 m staging MBR-3, Provinding Laying, Jointing, and Testing, & commissioning of Raw water pumping Main DI K-9 350 mm dia Total Length – 1320 m and Clear water Pumping Main 100 mm dia DI K-9 Length – 4530 mts, 150 mm dia DI k-9 Length – 490 mts, 200 mm dia DI K-9 Length – 13900 mts, 300 mm dia DI K-9 Length -9165 mts, Total Lngth – 28085 mts, & Clear water Gravity Main Pipe DI k-7, 300 mm dia Length – 70 mts & O-PVC PN-16, 250 mm dia Length – 22410 mts, 160 mm dia Length – 18446 mts, 110 mm dia. Length – 66176 mts, Total Length – 107032 mts, with all required Valves & Specials, Providing and Fixing Bulk Flow meter for entire scheme upto Village OHT’s with all Allied civil work including boundary walls, I- type 2 Nos. & H- type 2 Nos. Staff Quarters, including 3month testing and 9 month trail run, under Khairbar Group Water Supply Scheme of Block – Ambikapur, District – Surguja (C.G.).
|
|
|
|
|
|
|