Product Detail :
|
Mechanized excavation, loading, transportation and unloading of 1.0 lakh tons of iron ore fines from fine ore dump (FOD) to Dep- 10/11A fine ore stockpile LP through weigh bridge at an average lead distance of 3.5 kms one way approx. as and when required.
|