Product Detail :
|
Constructing steel structure elevated service reservoir of 8 nos 10 kl 12 meter staging. & providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia to 75 mm hdpe pe-100 , with suitable joints & 50mm to 80 mm dia gi pipe, valve specials and all fittings including all allied civil works. Supplying & installation of energy efficiant five star bee rating isi marked required capacity single and three phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with contral panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, ss/nylon wire rope and connection cable including verification of tubewell yield & electric connection from cseb, construction of rcc structure brick masonry switch room of 2 nos size 1.5*1.5*2.5 mtr providing 80 nos functional household tap connection(f.h.t.c) in individual households , drilling of tube well, construction of boundary wall etc. complete with three month trial run and operation & maintenance for 06 months under piped water supply scheme under jal jeevan mission for village lurena, block mainpath, .district – (c.g.). total length- 9072 meter
|
Tender Detail : |
Constructing steel structure elevated service reservoir of 8 nos 10 kl 12 meter staging. & providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia to 75 mm hdpe pe-100 , with suitable joints & 50mm to 80 mm dia gi pipe, valve specials and all fittings including all allied civil works, supplying & installation of energy efficiant five star bee rating isi marked required capacity single and three phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with contral panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, ss/nylon wire rope and connection cable including verification of tubewell yield & electric connection from cseb, construction of rcc structure brick masonry switch room of 2 nos size 1.5*1.5*2.5 mtr providing 80 nos functional household tap connection(f.h.t.c) in individual households , drilling of tube well, construction of boundary wall etc. complete with three month trial run and operation & maintanance for 06 months under piped water supply scheme under jal jeevan mission for village lurena, block mainpath, .district – surguja (c.g.). total length- 9072 meter |