Product Detail :
|
EPC, testing, commissioning, trial run for 3 Months after it 9 month Operation & Maintenance including replacement & warranty of all components of 1 Nos STPs of Capacitiy 2.80 MLD with SBR technology including designing, P/L/L/J of RCC NP3 pipes interceptor sewer of Length 123m (400-700 mm Dia), 2 Nos Collection chambers, Disposal line of length 100 m (700 mm Dia) and Pumping Station, DI K-9 Pumping main of Length 550 m (300mm Dia) Total length 773 m with all allied components complete on TURN KEY JOB basis.
|
Tender Detail : |
Epc, Testing, Commissioning, Trial Run for 3 Months After It 9 Month Operation & Maintenance Including Replacement & Warranty of All Components of 1 Nos Stps of Capacitiy 2.80 Mld with Sbr Technology Including Designing, P/l/l/j of Rcc Np3 Pipes Interceptor Sewer of Length 123m (400-700 Mm Dia),2 Nos Collection Chambers, Disposal Line of Length 100 M (700 Mm Dia) and Pumping Station, Di K-9 Pumping Main of Length 550 M (300mm Dia) Total Length 773 M with All Allied Components Complete on Turn Key Job Basis. |