Product Detail :
|
Construction of rub (01 no) br-5 at ch 3544m of spur line between gharghoda (km 0.00) and gare – pelma (km 28.00) in connection with the construction new bg electrified double rail line from kharsia to dharamjaygarh for chhattisgarh east railway limited over south east central railway in the state of chhattisgarh.
|