Product Detail :
|
Development of embankment and reclamation of cspgcl land at lhs of intake canal by ash utilization at htps cspgcl. Utilization of fly ash by ash filling near ash dyke pond b in 3.00 m height (339.00m to 342.00m) & utilization of fly ash of pond a2 by isolation of shaft of pond al & filling dry ash in isolated area up to top of bund in lotlota ash dyke of htps cspgcl. Utilization of fly ash by ash filling in colony complex near 22 block and 5 block at htps. Raising the height of pond no. 2 from rl 310.00m to 313.00m of ash dyke of 1x500 extension unit dindolbhata at htps. Ash utilization works by filling ash in low laying area parallel to ash silo road and modification of ash silo road from power house gate no. 02 to balco korba road at dspm tps cspgcl. Annual repair and maintenance of load line return line and oil siding line including inside mgr loop of cspgcl private railway siding line for uninterrupted coal supply from naila railway station to power house at 2x500 mw abvtps cspgcl. Fly ash utilization by filling in open abandoned mines & low lying area within lead of 50 kms from power house and ash bund of 2x500 mw. et/15 abvtps cspgcl.
|